CRIAD

Every day to power counts. Stop spending them waiting.

Criad connects the drawings, specs, model, programme and procurement of a data centre build, so the answer and its evidence are in the meeting. Meetings with decisions, not a plan for more meetings.

For owners, general contractors, subcontractors and integrators.

Not building data centres? Criad works on any project

Four changes on one campus, and the second-order effect of each, found before it is built.

CriadReference campus
00 Model › views › densifyModel Viewer
Viewport · Hall 2 · real geometry, read from OpenUSD

A live model, not a video: the product workspace on a reference campus.

The cost of waiting

Most schedule loss is waiting for answers

Answers wait on information held in different systems. A submittal sits, a change assessment goes round several companies, an RFI makes its round trip.

TODAYENERGISE
1
2
3
  • 1submittal sits
  • 2change assessment
  • 3RFI round-trip
ON CRIADENERGISE
time recovered

answers come with evidence; decided in the meeting

buildingwaiting on answersschematic, not to scale

The cost of waiting

$8-40M

per day · per gigawatt

Lost revenue for every day a gigawatt of capacity waits to energise.

Low end: colocation-rate delay estimates (Exto, 2026) · top: AI capacity pricing, ~$15M per MW-year (2025 analyses)

$720-745B77%

Planned 2026 capital spend by the four largest cloud builders, most of it AI data centres. Up 77% on 2025.

Source: company Q2 2026 earnings guidance.

The verified data layer

Retrieve. Verify. Act.

An agent is only as good as the ground it stands on.

Retrieve

Any fact about the project, pulled from one connected structure, in seconds. Not searched for across five systems.

"How deep may the Hall 2 cabinets be?" 0.92 m, from the governing spec.

Verify

Checked against the governing drawing or spec, measured on real geometry, evidence attached to every answer.

Requested 1.0 m measured against it: 0.08 m over the limit.

Act

People decide, with the proof in front of them. Every decision reviewable later, with its evidence still attached.

The change assessment, both sources cited, in front of the person who decides.
You do not get there by adding chat to the document pile. You get there by fixing the ground.
This is the actual interface

The Criad workspace, on a reference campus.

Not a mock-up. The same workspace your team opens: the project folder as it was issued, the model, the drawings, the specs, the schedules and the dashboards in one place, with the assistant beside them. Click the tabs.

CriadReference campus Live workspace
00 Model › Campus modelModel stage
Viewport · whole campus · cutaway · read from OpenUSD
Live workspace · reference campus · every value from its documents and model
The ask

Judge it on a real job.

Book a call. Bring a real question from a job you know, and see how the answer and its evidence come together.

Your project, as it is. Drawings, specs, model and programme come in without retyping.

Your questions, with evidence. Every answer cites the sheet, the clause or the measurement.

Your people decide. Every decision keeps its evidence for later review.

Stop waiting. Start building.

Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.

Book a call